Helix Monitor

Once again,  today, I was able to get the CEO to go under the helix and assist with determining camera placement for the helix monitor.  After testing several different locations it was determined that a second camera is needed.  That has been placed on order and everything should be installed in time for the next OPS session scheduled for June 15th.

Additionally some minor maintenance needs to be completed before the session.  But that should not be a problem.

Earlier this week I finished making all of the coal loads.  That only took about ten years to complete.  But they do look better than the blank painted hard board blocks I was using.

Everything is looking like a GO for June 15th!