The pier contractor contacted E&P today and notified them that the materials for the bulkhead had been cut and sent to the creosoters. And the creosoters called soon after and notified E&P that all of the material had been creosoted and was ready for shipment to the work site. Installation of the bulkhead should start tomorrow.
Getting ready for driving piling I also made two guides; one for aligning the first row of pilings and one for aligning the track on the pier. Both use the backdrop as a reference point. But I doubt if I will get to use either tomorrow.
Sunday, June 2, 2013
Pier Progress
Posted by
Superintendent Easton and Potomac