I think the roads in the Brooke area are now almost complete. Friday I got the tire lanes carved into them and a final coat of paint. I tried adding a black wash but that was too heavy. So I referenced my Frary document and will be mixing up some black wash specifically for the roads and try that. If that works out then the roads will be done and I can move on to more vegetation.
In addition to the roads I located and purchased some drill stops. Every once in a while you find something that costs less than you expect. I found some drill stops (I will be using these with the pile drilling and cutting jig to control the depth of the piling hole) at a woodworking specialty shop for about $13.00. A little more looking and I found them at Harbor Freight for $3.00. Much better.
I have also started on the pier warehouse which consists of doing a drawing and developing a BOM.