Easton & Potomac trackage - red lines

Friday, April 26, 2013

Roads Part 2

I think the roads in the Brooke area are now almost complete.  Friday I got the tire lanes carved into them and a final coat of paint.  I tried adding a black wash but that was too heavy.  So I referenced my Frary document and will be mixing up some black wash specifically for the roads and try that.  If that works out then the roads will be done and I can move on to more vegetation.

In addition to the roads I located and purchased some drill stops.  Every once in a while you find something that costs less than you expect.  I found some drill stops (I will be using these with the pile drilling and cutting jig to control the depth of the piling hole) at a woodworking specialty shop for about $13.00.  A little more looking and I found them at Harbor Freight for $3.00.  Much better.

I have also started on the pier warehouse which consists of doing a drawing and developing a BOM.

No comments: