Easton & Potomac trackage - red lines

Friday, April 12, 2013

House Progress

After vacuuming up the loose static grass between Crooked Creek trestle and Thorny Point I applied three coats of zip texturing to the Easton Transfer company spur.  I then went to work on the house.

In the picture below I am installing the glazing for the windows.



I got all of the glazing installed and all of the sashes installed.  I then moved on to the shingles.  This is the most tedious and time consuming job on most kits.  But I did get on of the two shingled roofs complete and started on the second.

With a little luck this kit will replace the cardboard mock up before the next OPS session.

To see a picture of the house go to www.easton-and-potomac.com.

No comments: