After vacuuming up the loose static grass between Crooked Creek trestle and Thorny Point I applied three coats of zip texturing to the Easton Transfer company spur. I then went to work on the house.
In the picture below I am installing the glazing for the windows.
I got all of the glazing installed and all of the sashes installed. I then moved on to the shingles. This is the most tedious and time consuming job on most kits. But I did get on of the two shingled roofs complete and started on the second.
With a little luck this kit will replace the cardboard mock up before the next OPS session.
To see a picture of the house go to www.easton-and-potomac.com.
No comments:
Post a Comment