Today was a day of trying to solve some Digitrax issues that keep coming up such as the system going to sleep when someone presses the STOP button and the Slot Max event.
To try and solve the Sleep Mode issue I installed collars around all of the stop buttons on my throttles so you will need an uncoupling pick to be able to push the stop button. Hopefully this will prevent any more sleep events.
And after operating on a Slot Max layout this weekend I decided it was time to reset my command station so this issue doesn't come up during a session. It has been eighteen months since I had my Slot Max event and I decided the Slot Max issue on the other layout this weekend was a warning which I heeded.
I also applied some vegetation around the newly installed water and built some load platforms for the N&W gons that will be used to transport ties.
Tomorrow will be more vegetation and maybe some gon loads. Or maybe I will move on to the station platform at Hood. That is if the weather is not condusive to tree making in which case it will be on to trees!
Monday, October 15, 2012
Various Items
Posted by
Superintendent Easton and Potomac
at
5:24 PM
No comments:
Post a Comment