Easton & Potomac trackage - red lines

Monday, July 9, 2012

Tree Progress - First Box Done

The first box of tree armatures is done!

In the picture below are:
1. Finished armatures ready for their matte medium soaking in the two boxes on the table and the front one on the floor.
2. Small armatures that could be used for bushes in the small white box to the right of the table on the couch.
3. Thin armatures that could be prepped if needed but right now are not worth the effort in the larger box behind the white box on the couch.



No comments: