Easton & Potomac trackage - red lines

Wednesday, March 7, 2012

Road Construction

Today was a day of road construction. I was able to get the first coat on most of the layout's roads. But this took most of my road material so they probably will have to wait until I get some more material before they get their second coat and before I finish the remaining roads.

The picture below is of the roads in Brooke. These are two of the six I did today.
A picture of the roads around the top of the helix is on www.easton-and-potomac.com.

No comments: