Easton & Potomac trackage - red lines

Friday, September 30, 2011

Caming progress

#31 shown below has had its cam installed on the bottom left driver (you can't see it in this picture) and the soldering pad for the control wire (brown which you also can not see in this picture) and the cam wiper.
I found some conductive glue that I ordered that I will use to make the electrical contract between the cam and the driver. It was less than half the price of conductive epoxy and it is supposed to have glue properties that the Circuit Writer pen doesn't. We will see how it works. If it does what I hope it will do this engine could be back in service and cam equipped by the next session.

No comments: