Easton & Potomac trackage - red lines

Wednesday, September 2, 2009

Swift Run to Stanley

About 90% of the Gypsolite has been installed between Swift Run and Stanley and Swift Run and Hopkins Spring. I will wait until it has dried and see where it needs to be touched up. I also decided to add rock castings in three places on the Hopkins Spring side of the Swift Run tunnel so they will have to be installed later.


Below is a picture of the area between Swift Run and Stanley ready for applying the Gypsolite.
I also got the helix patch top and right side cut in with Gypsolite so tomorrow I will remove the top of the helix and start on the rock castings and Gypsolite on the helix hatch.
If you want the see the engineer's view coming into Stanley go to http://www.easton-and-potomac.com/.

No comments: