Easton & Potomac trackage - red lines

Monday, July 9, 2018

Lynch River Water Fall

Today started the installation of the water fall between the upper and lower Lynch River beds.

The bottom edge of the water fall has been glued in place and once this dries the upper edge will be fitted and glued.

After the upper edge is dry then additional painting and gloss gel will be applied to the water fall and the remainder of the river bed.

A picture of the installation process for the water fall is on www.easton-and-potomac.com.

No comments: