Easton & Potomac trackage - red lines

Thursday, April 26, 2018

Lynch River

Today I put down the first layer of the river bed for the Lynch River.

Some larger rocks will be added along with tree debris and maybe some trash before the Envirotex is poured.

The section of the river in front of the bridge from where it falls down to a lower level (black visible line) will be installed after the upper level has been completed.


Current state of the Lynch River.

No comments: