The scenery work in Lacey Springs is on schedule.
After a 30 minute search for my Gypsolite (I had a 5 gallon container full instead of a 2 gallon container and I was looking for the 2 gallon container) I got that applied. (See picture below.)
Tomorrow this will get a coat of the basic earth color. And if that dries before the end of the day I will apply the forest floor flocking.
The new ground contours have received their top coat of Gypsolite.
No comments:
Post a Comment