Easton & Potomac trackage - red lines

Friday, July 5, 2013

Thorny Point Warehouse Update

Despite the wind, which wants to blow a gale here every day, I have managed to get the warehouse building primed and painted.  I think.  It has had two coats of primer and four coats of bright aluminum.  So it should be good.  Next step is to bring it inside and check it to make sure it has good coverage and then install the doors and windows and sign.

Between painting episodes I worked on making some signs.  (Mostly right-of-way signs.)  The verdict on these is still out.  The signs have been laminated to some .01 styrene and given a couple of passes of a dull coat to protect the printing.  I will give them a couple of days to set and then trim and install the posts.  Maybe some of them will be on the layout at the next session.

No comments: