Today the contractors got the end walls installed and the roof pieces cut and ready for installation. However they ran out of bracing material and had to quit for the day. But not until they were able to get the spacers installed between the backdrop and the front of the warehouse.
Most of the day was spent trying to get the building to sit tight against the backdrop. I think I will go and get some magnets and tape them to the backdrop and to the spacers and see if they will pull the building back against the backdrop. Everything else I have tried only forces the top of the building away from the backdrop. (This building has VERY close clearances and needs to be tight against the backdrop and not able to move.)
Friday, June 28, 2013
Thorny Point Warehouse Progress
Posted by
Superintendent Easton and Potomac
at
2:27 PM
No comments:
Post a Comment