Today the crew for the company that will be building the bulkhead and pier started work on the pier with the placing of the sills.
The picture below shows the setup for guiding the sill installation.
However this was not used because it was too much in the way and the backdrop and pilings gave good enough reference points for the sills.
To see how far the crew got today go to www.easton-and-potomac.com.
No comments:
Post a Comment